BOQ & Costing
Trade Types

Trade Types

BuildVision organizes construction work by trade using CSI MasterFormat divisions. This helps with filtering, exporting, and getting accurate labor rates.

Supported Trades

TradeCSI DivisionWhat it covers
Demolition02 Existing ConditionsSelective demo, hazmat removal, salvage, site clearing, strip-outs
Concrete03 ConcreteFootings, slabs, columns, walls, rebar, foundations
Masonry04 MasonryCMU, brick, stone, block, mortar
Structural Steel05 MetalsBeams, columns, connections, plates, bracing, joists
Openings08 OpeningsDoors, windows, storefronts, curtain walls, hardware
Finishes09 FinishesDrywall, tile, flooring, paint, ceilings, carpet
Roofing07 Thermal & MoistureRoofing, insulation, waterproofing, membranes
Fire Protection21 Fire SuppressionSprinklers, standpipes, fire alarms, extinguishers
Plumbing22 PlumbingFixtures, piping, valves, drains, water heaters
HVAC23 HVACDuctwork, diffusers, equipment, thermostats
Electrical26 ElectricalOutlets, panels, switches, conduit, lighting
Site & Civil31-33 Site/CivilEarthwork, paving, utilities, landscaping
General01 GeneralCatch-all for items that don't fit elsewhere

Setting Your Specialties

If your company focuses on specific trades, set them in settings:

  1. Go to Settings > Company > Trade Specialties
  2. Select the trades you work with
  3. Save

This does a few things:

  • Faster AI detection - System focuses on relevant symbols
  • Cleaner UI - Your trades show first in dropdowns
  • Better accuracy - Less noise from irrelevant detections

Trade-Based Detection

When you run AI takeoff, you can filter by trade:

  1. Select pages
  2. Click Run AI Detection
  3. Choose Trade Filter
  4. Select one or more trades
  5. Run detection

The AI looks for symbols specific to those trades. Running "Electrical" finds outlets, panels, switches - not plumbing fixtures.

Trade Packages in Export

Excel export creates separate sheets per trade. Each sheet has:

  • Items for that trade only
  • CSI codes
  • Material costs
  • Labor hours and costs
  • Category subtotals
  • Package total

Send these directly to subcontractors for pricing.

Labor Rates by Trade

Each trade has its own labor rates. See Labor Rates for the full breakdown.

Quick reference:

  • MEP trades (electrical, plumbing, HVAC) - Higher rates ($80-85/hr journeyman)
  • Structural (concrete, steel, masonry) - Mid-range ($65-75/hr)
  • Finishes (drywall, paint, flooring) - Lower rates ($45-60/hr)
  • Demolition - Mid-range ($60/hr lead, $40/hr laborer)